← DEEP CYGNUS
🛡

PKA Universe — Priorities Audit

Deep Cygnus | March 28, 2026


1A. Delphi Deep-Dive Session

Who: Will + Delphi

Purpose: Build the predictive model — boss pattern map, cascade architecture, freedom window optimization, anchor events, whisper feed protocol

Time needed: 45-60 minutes

Why today: Momentum is hot, context is fresh, and this session informs every other department's planning

1B. Hormozi / Vibey League Strategy Session

Who: Will + Hormozi

Purpose: FC roster clout audit (54 → 52 candidates), interview sequencing, first episode selection, launch date, activation strategy

Why today: Will's passion energy for VL is peaking — channel it into concrete decisions


Priority 2: This Week (Before April 3)

2A. Strava API Setup (5 minutes from Will)

Who: Will → Neo

Action: Create Strava API app at strava.com/settings/api, paste credentials into Claude Desktop config. Request bulk export at strava.com/account.

Blocked on: Will's 5 minutes. Everything else is built and waiting.

2B. SHIP_ID Extraction via Chrome MCP

Who: Neo (via Claude Cowork/Chrome MCP)

Action: Run the React Fiber extraction script on MarineTraffic to get all 51 SHIP_IDs. Update mainframe.

Blocked on: Chrome MCP access (needs to run in Cowork or Claude Desktop)

2C. Dr. House Pre-Appointment Brief

Who: Dr. House

Action: Prepare the April 3 PCP pre-appointment brief — what to say, what tests to demand, red flags to watch for

Deadline: April 2 (day before appointment)

2D. Cancel Datalastic Trial

Who: Will

Action: Cancel before auto-renewal. Takes 2 minutes.

2E. Saul's Urgent Flags Review

Who: Will

Action: Read Owners Inbox/saul-goodman-urgent-flags.md — 7 legal issues, some time-sensitive

Note: The retention bonus documentation is now stronger than expected (Chris Allen email), but other flags remain open


3A. Logo Design Brief — Finalize & Send to Designer CRITICAL PATH

Who: Jony Ive

Action: Polish and finalize the logo design brief for all 4 logos (Shore Party, Vibey League, Frequency Holders, and any other marks). Review existing brand brief (21-page PDF), reference imagery (51 images in 9 categories), and produce a designer-ready brief. Send to external brand designer for production.

Why critical: The website CANNOT go public before the logos are established. This is upstream of everything — blocks Shore Party website, Vibey League website, and all public-facing materials.

Existing assets: Brand brief PDF, locked color palettes, typeface registers, 51 reference images in Brand Assets/Logo Design/

3B. Shore Party Website — Design Spec

Who: Jony Ive + Neo

Action: Produce full design specification for shoreparty.cc — wireframes, color palette, typography, component architecture, AI concierge design, interactive map design

Dependency: Will's creative direction (provided today — Chania Lighthouse, velvet rope, "if you know you know") + finalized logos from 3A

3B. ahoy@shoreparty.cc Email Setup

Who: Neo

Action: Create the Shore Party contact email

3C. Abby's Budget Deep-Dive

Who: Abby (via Chrome MCP on Copilot Money)

Action: Full category architecture review, W-2 analysis for retention bonus modeling, domicile day-count assessment

3D. Buffet's Portfolio Rebalancing Proposal

Who: Buffet + Ramit

Action: Propose growth tilt strategy, SGOV deployment plan, updated asset allocation. Present to Will for approval.

3E. MarineTraffic Optimization

Who: Lord High Admiral + Neo

Action: Implement the Dense Track weekly harvest cadence. First SHIP_ID batch unlocks this. Begin itinerary reverse-engineering.


Priority 4: Next 30 Days

4A. Shore Party Website — Build

Who: Neo + Jony Ive

Action: Build shoreparty.cc based on approved design spec. AI concierge agent. Interactive map. Deploy.

4B. Vibey League — FC Activation

Who: Hormozi

Action: Execute Phase 1 — lock the founding members, begin personalized outreach, first interview production

4C. Scheduled Tasks Rewiring

Who: Neo

Action: Update remaining scheduled task paths from Cowork to PKA. Verify all 8 tasks are operational.

4D. Delphi's Forecast System

Who: Delphi + Neo

Action: Build the mainframe tables for predictions, intelligence log, calendar cache. Begin daily forecast production.

4E. Domicile Strategy — FL Transition Plan

Who: Abby + Saul

Action: Joint assessment of current domicile situation, FL LLC formation, day-count tracking, tax implications. Present recommendation.



Owners Inbox — Unread Items

File From Action Needed
saul-goodman-urgent-flags.mdSaulREAD — time-sensitive legal flags
marinetraffic-optimization.mdNeoReview Dense Track strategy
strava-setup-status.mdNeo5 min action items
integration-strategy.mdNeoMaster integration plan
calendar-integration-status.mdNeoFYI — already working
ship-id-extraction.mdNeoReady to execute via Chrome MCP
strava-integration-options.mdNeoStrategy approved, execution pending
marinetraffic-api-recommendation.mdNeoDecision made: Pass
datalastic-assessment.mdNeoDecision made: Cancel today
cowork-migration-manifest.mdNeoComplete — archival reference

Prepared by Deep Cygnus, Orchestrator, PKA
March 28, 2026

Voice Reply