Who: Will + Delphi
Purpose: Build the predictive model — boss pattern map, cascade architecture, freedom window optimization, anchor events, whisper feed protocol
Time needed: 45-60 minutes
Why today: Momentum is hot, context is fresh, and this session informs every other department's planning
Who: Will + Hormozi
Purpose: FC roster clout audit (54 → 52 candidates), interview sequencing, first episode selection, launch date, activation strategy
Why today: Will's passion energy for VL is peaking — channel it into concrete decisions
Who: Will → Neo
Action: Create Strava API app at strava.com/settings/api, paste credentials into Claude Desktop config. Request bulk export at strava.com/account.
Blocked on: Will's 5 minutes. Everything else is built and waiting.
Who: Neo (via Claude Cowork/Chrome MCP)
Action: Run the React Fiber extraction script on MarineTraffic to get all 51 SHIP_IDs. Update mainframe.
Blocked on: Chrome MCP access (needs to run in Cowork or Claude Desktop)
Who: Dr. House
Action: Prepare the April 3 PCP pre-appointment brief — what to say, what tests to demand, red flags to watch for
Deadline: April 2 (day before appointment)
Who: Will
Action: Cancel before auto-renewal. Takes 2 minutes.
Who: Will
Action: Read Owners Inbox/saul-goodman-urgent-flags.md — 7 legal issues, some time-sensitive
Note: The retention bonus documentation is now stronger than expected (Chris Allen email), but other flags remain open
Who: Jony Ive
Action: Polish and finalize the logo design brief for all 4 logos (Shore Party, Vibey League, Frequency Holders, and any other marks). Review existing brand brief (21-page PDF), reference imagery (51 images in 9 categories), and produce a designer-ready brief. Send to external brand designer for production.
Why critical: The website CANNOT go public before the logos are established. This is upstream of everything — blocks Shore Party website, Vibey League website, and all public-facing materials.
Existing assets: Brand brief PDF, locked color palettes, typeface registers, 51 reference images in Brand Assets/Logo Design/
Who: Jony Ive + Neo
Action: Produce full design specification for shoreparty.cc — wireframes, color palette, typography, component architecture, AI concierge design, interactive map design
Dependency: Will's creative direction (provided today — Chania Lighthouse, velvet rope, "if you know you know") + finalized logos from 3A
Who: Neo
Action: Create the Shore Party contact email
Who: Abby (via Chrome MCP on Copilot Money)
Action: Full category architecture review, W-2 analysis for retention bonus modeling, domicile day-count assessment
Who: Buffet + Ramit
Action: Propose growth tilt strategy, SGOV deployment plan, updated asset allocation. Present to Will for approval.
Who: Lord High Admiral + Neo
Action: Implement the Dense Track weekly harvest cadence. First SHIP_ID batch unlocks this. Begin itinerary reverse-engineering.
Who: Neo + Jony Ive
Action: Build shoreparty.cc based on approved design spec. AI concierge agent. Interactive map. Deploy.
Who: Hormozi
Action: Execute Phase 1 — lock the founding members, begin personalized outreach, first interview production
Who: Neo
Action: Update remaining scheduled task paths from Cowork to PKA. Verify all 8 tasks are operational.
Who: Delphi + Neo
Action: Build the mainframe tables for predictions, intelligence log, calendar cache. Begin daily forecast production.
Who: Abby + Saul
Action: Joint assessment of current domicile situation, FL LLC formation, day-count tracking, tax implications. Present recommendation.
| File | From | Action Needed |
|---|---|---|
| saul-goodman-urgent-flags.md | Saul | READ — time-sensitive legal flags |
| marinetraffic-optimization.md | Neo | Review Dense Track strategy |
| strava-setup-status.md | Neo | 5 min action items |
| integration-strategy.md | Neo | Master integration plan |
| calendar-integration-status.md | Neo | FYI — already working |
| ship-id-extraction.md | Neo | Ready to execute via Chrome MCP |
| strava-integration-options.md | Neo | Strategy approved, execution pending |
| marinetraffic-api-recommendation.md | Neo | Decision made: Pass |
| datalastic-assessment.md | Neo | Decision made: Cancel today |
| cowork-migration-manifest.md | Neo | Complete — archival reference |
Prepared by Deep Cygnus, Orchestrator, PKA
March 28, 2026